construction

Mechanic engineering (solids & heat branch) are the main special apply to project construction (for example: Fabrication & Erection, Alignment, pre-commissioning and commissioning):

General construction

–  Mobilization

–  Civil – Mechanical (Mechanic,Piping,Electrical ,Instruments ,Insulation)

–  Pre-commissioning & commissioning.

   Mobilization:

–    Prepare administration building & facilities

–    Prepare shop (fabrication, welding, piping, paint & sandblast, insulation, etc)

–    Prepare ware house (tools & device, etc)

–    Prepare crane & machinery equip & vehicle

 

  Civil works:

All civil works including excavation, concrete foundation, back filling, steel structure

To Construction of industrial and residential buildings with relevant HVAC facilities.

–    Access paths

–    Concrete works (building & equipment foundation, trenches, etc)

–    Building

–    Steel structure (fabrication , erection , paint & sandblast , touch up)

–    Architecture works

–    Paving

–    Miscellaneous works

 

Mechanical:

 Mechanic

– Material request & control (Rotary equip : motor & pumps, agitator, fans, fan
blowers, compressor & etc — static equip : vessels, ex-changer, drums, bag
filter, tank & silos & etc —  package : dryer , bagging machine, main
compressor, cooling tower & etc) .

–    Technical office (equipment drawing control, equipment foundation control,

erection inspection, construction procedure & etc).

–    Survey, Foundation hand over

–    Prepare equipment erection (foundation prepare, cleaning , chipping &

padding)

–    Equipment erection (orientation, position)

–    Equipment alignment (static equip : leveling , plumb ness ٌ rotary equip:

leveling , first alignment , second alignment , final alignment)

–    Storage tanks (S. S & C.S) & S.S silos (fabrication at site).

–    Miscellaneous works

 

  Piping:

–    U/G (under ground) piping & A/G (above ground) piping

–    Pipe support fabrication & installation

–    S. S (Stainless Steel & C.S (Carbon Steel) piping

–    Test package

 

  Electrical & Instrument:

Construction and erection of electrical and instrumentation and process control equipment

–   Support & ladder & erection
–   Cable laying

–    Calibration & testing of instruments

–    M.C.C & control panel

 

  Paint & insulation:

–    Sandblast

–    Primary & intermediate & final coat
–    Vessels & piping insulation

 

   Pre-commissioning & commissioning:

Pre-commissioning test and commissioning of all types of industrial machineries and equipment with process control systems.

 

Prepare planning & time schedule & man powers estimated. (Around 100 qualified people as a potential task force)

  

   Mechanical completed (remaining works)

Alignment & accessories erection & equipment control

–    Electrical  & instrument completed (remaining works)

–    Calibration & testing of instruments

–    M.C.C & control panel

–    Single start (free run or unload start) from power substation.

Test time: 8 hours continues with PLC (power logic control) from C.C.R

(central   control room)

–    loaded start  or group start (test and start with loading)

Test time: 8 hours continues with PLC (power logic control) from C.C.R

(central control room)

–    Department test and start (package test and start) step by step

–    Area & sub area test

Test time: 48 hours continues with PLC (power logic control) from C.C.R (central

control room)

–    Area test and start (with process  from C.C.R with PLC (power logic

control)

Test time: 168 hours continues (one week)